TCN begins urgent repairs on Ikot Abasi-Eket power transmission line after vandalism
by Ogaga Ariemu · Daily PostThe Transmission Company of Nigeria, TCN, said it has commenced urgent rehabilitation work on Towers J4 and N9 to N12 along the Ikot Abasi-Eket 132kV double-circuit transmission line following recent acts of vandalism.
TCN made this disclosure in a statement on Monday.
According to TCN, during a site inspection on Friday, September 25, 2026, the Regional Manager, Engr. Nasir Bello, represented by the Assistant General Manager, AGM, Transmission, Port Harcourt Region, Ubani Raymond, spoke of the need to ensure strict adherence to engineering specifications.
He further urged residents of Ikot Abasi to remain vigilant and actively protect critical power infrastructure within their communities from criminal elements.
Recommended
NCGC guarantees unlock N46.95bn loans for 67,512 Nigerians – Tinubu
Irregular migration: Analyst tells FG how to stop exploitation of Nigerian youths
Court orders NMDPRA to keep granting fuel import licences to Matrix, AA Rano, AYM
On his part, the Head of Lines, Port Harcourt Transmission Region, Engr. Azuh Lucky, noted that the challenging terrain and persistent rainfall had slowed the pace of work.
You may like
Fuel price: NNPCL reduces petrol price to N1,405 in Abuja
Nigeria’s N166.79trn debt: Expert reveals what rising borrowing means for Nigerians
Fuel price: Tinubu’s N70,000 minimum wage can only buy 50 litres of petrol – Atiku