Odisha Mandates Urgent Monsoon Road Repairs Ahead of Dussehra
by Vinay Kakkad · KalingaTVAdvertisement
Following a destructive seasonal monsoon that triggered landslides, flash floods, and widespread surface erosion, the state government has instituted a mandatory, biweekly reporting protocol to accelerate repairs across its fractured road and bridge network. Under the new guidelines, departmental engineers—ranging from junior personnel to the Chief Engineer—are required to maintain an active physical presence at work sites, supervise construction quality firsthand, and submit comprehensive progress assessments every 15 days.
The directive was issued during a high-level review chaired by Odisha’s Minister for Law, Works, and Excise, Prithviraj Harichandan, at Lok Seva Bhawan.
Harichandan cautioned that lapses in execution will bring disciplinary measures, emphasizing that neither departmental complacency nor sub-standard output from private contractors will be excused. He noted that citizens are entitled to reliable transit infrastructure and instructed authorities to treat road-related grievances raised on social media platforms as top-priority alerts rather than administrative afterthoughts.
Advertisement
The aggressive restoration drive targets several regions where downpours caused severe structural degradation. Key transit corridors under immediate scrutiny include the Nakhara–Niali link, the Adasapur–Jagatsinghpur corridor, and the treacherous Kalinga Ghat stretch. Beyond these focal routes, substantial road damage has been documented across Cuttack town, Paradip, and the districts of Koraput, Bhadrak, Balasore, Ganjam, Sambalpur, and Keonjhar, along with other affected pockets of the state.
To remove administrative hurdles slowing down ground recovery, Principal Secretary Sanjay Kumar Singh called for an expedited, transparent tendering framework. Singh specifically urged teams to optimize their use of the Works Information Management System (WIMS) software, ensuring project documentation moves through digital approvals without bureaucratic stagnation.
The strategy session was attended both in person and virtually by key leadership, including Chief Engineer (Civil) Satyabrata Behera, alongside senior administrators Sameer Hota, Ratikanta Mahapatra, Deepak Ranjan Das, and Pradeep Kumar Sahu, accompanied by zonal chief and superintending engineers tasked with executing the post-monsoon turnaround.
Advertisement