Nigeria’s power plants operated at 31% capacity in April — NERC
The April data reinforce the longstanding structural challenge in Nigeria’s electricity sector, where installed generation capacity remains significantly higher than the actual available and dispatchable power.
8 May 18:12 · Premium Times