Phase 1 of Kuching Urban Transportation System on schedule at 25.8 pct, says Dr Jerip
KUCHING (Nov 15): Overall progress on the Kuching Urban Transportation System (KUTS) project for Phase 1 stood at 25.8 per cent in October, said Datuk Dr Jerip Susil. The Deputy Minister for Transport said this was slightly ahead of the planned schedule of 24.73 per cent. He shared that the breakdown stood at 79.01 perRead More
15 Nov 03:14 · Borneo Post Online