Desa Wira Sinar Budi Baru drainage upgrading works ahead of schedule, says Batu Kawa rep
KUCHING (Oct 26): Three major drainage systems in Desa Wira Sinar Budi Baru, Batu Kawa here are being upgraded and are progressing ahead of schedule, said Deputy Premier Datuk Amar Dr Sim Kui Hian. The works include upgrading works along Lorong Desa Wira 17B1 and 17B2 costing over RM3.54 million;
26 Oct 06:41 · Borneo Post Online